HCP Overview
03 Aug 26 – 04 Aug 26
Public Cloud
Integration
Rollout Outcomes
6/9 Succeeded
Running: 1/9 (11%)
Succeeded: 6/9 (67%)
E2E Failed: 2/9 (22%)
E2E Test Success Rate
Avg. Time Between
3h 36m
Avg. Bump Duration
3h 18m
Latest Rollout Finished
3h 6m ago
2026-08-04T05:24:26Z 04 Aug 26 05:24 UTC
Latest Rollout Status
Succeeded
Staging
Rollout Outcomes
1/6 Succeeded
Succeeded: 1/6 (17%)
Failed: 3/6 (50%)
E2E Failed: 2/6 (33%)
E2E Test Success Rate
Avg. Time Between
5h 25m
Avg. Bump Duration
3h 40m
Latest Rollout Finished
1h 54m ago
2026-08-04T06:36:38Z 04 Aug 26 06:36 UTC
Latest Rollout Status
E2E Failed
Production
Rollout Outcomes
0/3 Succeeded
Running: 2/3 (67%)
Canceled: 1/3 (33%)
E2E Test Success Rate
Avg. Time Between
10h 50m
Avg. Bump Duration
-8376s
Latest Rollout Finished
15h 6m ago
2026-08-03T17:25:08Z 03 Aug 26 17:25 UTC
Latest Rollout Status
Canceled